23.6 C
Washington

ISRO Plans In-Flight Cryogenic Stage Restart to Boost Mission Efficiency

Date:

Share:

Bengaluru: A day after ISRO successfully carried out the ignition trial of the indigenous CE20 cryogenic engine, its Chairman and Secretary of Department of Space V Narayanan on Saturday said that the test would be advantageous to missions. The Chairman also said there were no glitches as reported in the media in ISRO’s first Space Docking Experiment (SpaDeX) mission. “We want to restart the cryogenic stage in the flight for mission advantages. So, we recently carried out a test towards that,” Narayanan told PTI on the sidelines of the 15th Biennial Edition of Aero India International Seminar 2025, held in Bengaluru.

On February 7, ISRO successfully carried out the ignition trial of the indigenous CE20 cryogenic engine powering the upper stage of LVM3, with a multi-element igniter under vacuum conditions, which simulates the engine ignition in the vacuum condition of space. This test was carried out in the High-Altitude Test Facility at ISRO Propulsion Complex in Mahendragiri, Tamil Nadu.

According to an ISRO release, during this test, the ignition of the engine Thrust Chamber was carried out with a multi-element igniter in vacuum, under the tank pressure conditions that are expected to prevail at the time of restarting the cryogenic engine in flight.

The performance of the engine and the facility during the test was normal and as expected, it added. On reports in the media on glitches in the SpaDeX mission, Narayanan said, “No glitches, right now it is docked. We are going step by step. We are studying and then we are planning to do a lot of experiments.” On January 16, the space agency successfully performed the docking of satellites as part of the Space Docking Experiment (SpaDeX) and it also announced that post docking, control of two satellites as a single object was successful. In this mission, NVS-02 navigation satellite was successfully injected into the intended Geosynchronous Transfer Orbit.

But on February 2, ISRO issued an update stating that the orbit raising operations towards positioning the satellite to the designated orbital slot could not be carried out as the valves for admitting the oxidizer to fire the thrusters for orbit raising did not open.

The ISRO chairman was the chief guest at Aero India International Seminar 2025. This year, the international conference on military airworthiness explored the topic ‘futuristic aerospace technologies: challenges in design validation’.

Source link

Subscribe to our magazine

━ more like this

Butterfly from Southern Europe spotted in UK for first time

Tim DoddClimate and science reporterAdam Gor/Butterfly ConservationDr Dan Hoare, Director of Nature Recovery at Butterfly Conservation, said the species had made an "ecological leap"."There...

Video from Jan. 6 attack shows Justice Department adviser telling rioters attacking police to “kill ’em”

Washington — Video footage from the Jan. 6, 2021, assault on the U.S. Capitol shows a man who now works...

Omada Health beats on revenue in first earnings report since IPO

The Omada Health logo is displayed on a smartphone screen.Sopa Images | Lightrocket | Getty ImagesOmada Health reported quarterly results for the first time...

Colon cancer cases nearly doubled in 4 years among Americans 45-49, study finds

A new report from the American Cancer Society found that over a four-year period, the number of colon cancer cases among Americans ages 45...